Painting a picture with facts

On every project, there are usually unplanned and unexpected events which results into disruptions and delays to the schedule. Disputes may arise leading to the requirements for judication which can be costly if not dealt with correctly. In order to stand a chance of winning, your organisation needs to produce reports backed by factual evidence to detail what actually took place.

Forensic and delay analysis are the study and investigation of changed events which caused the delay to occur. Delay analysis identifies why delays occur on a construction project and the impact they are expected to have on the overall programme. Forensic planning is typically undertaken after the construction process has been completed and is the process of understanding delays which have occurred in construction programme periods.

 

How we do it

Based on the experience gained on previous projects, we are able to quickly identify where all the significant delays took place and strategise the approach which should be taken to recuperate delay/disruption cost, loss of earnings and extension of time.

Edward and Wilson will manage your construction dispute with a rapid response, through negotiation or formal dispute resolution proceedings and methods of Alternative Dispute Resolution (ADR) such as Adjudication. We will work along side your litigation team to ensure your case is robustly presented and supported by appropriate narratives and evidence.

If you want to present your claims professionally and ensure you receive the results that you are looking for, then Edward and Wilson is perfect for you.

  • Schedule Delay Analysis
  • Critical Path Analysis
  • Forensic Investigation of Project Delays
  • Report Writing
  • Monitoring and Resequencing of Existing Programmes

FEATURED PROJECTS

Looking for an experienced consultant for your next project?